RESOURCE
Electrical Design Checklist
The questions we resolve before a single line is drawn.
Load & demand
- Confirmed connected load and diversity assumptions
- Growth allowance agreed with the client
- Future EV / storage / generation capacity provisioned
Distribution
- Single-line diagram drafted
- Protection coordination reviewed
- Cable sizing verified with voltage-drop calculations
- Segregation of safety and control circuits confirmed
Compliance
- BS 7671 edition confirmed
- DNO notification requirements mapped
- Emergency lighting standard (BS 5266) identified
- Fire-alarm interface clarified
Handover
- EIC/EICR certification scope agreed
- O&M documentation format confirmed
- Maintenance plan drafted for handover