Skip to content
RESOURCE

Electrical Design Checklist

The questions we resolve before a single line is drawn.

Load & demand

  • Confirmed connected load and diversity assumptions
  • Growth allowance agreed with the client
  • Future EV / storage / generation capacity provisioned

Distribution

  • Single-line diagram drafted
  • Protection coordination reviewed
  • Cable sizing verified with voltage-drop calculations
  • Segregation of safety and control circuits confirmed

Compliance

  • BS 7671 edition confirmed
  • DNO notification requirements mapped
  • Emergency lighting standard (BS 5266) identified
  • Fire-alarm interface clarified

Handover

  • EIC/EICR certification scope agreed
  • O&M documentation format confirmed
  • Maintenance plan drafted for handover
CallRequest Quote