A high-power EV charging deployment using intelligent load management to serve dense rapid-charging bays from a constrained grid connection.

Birmingham, UKHigh-power EV charging + load management

The challenge

Provide rapid charging for a fleet and visiting bays without triggering an expensive grid reinforcement on a constrained site supply.

Design response

Local battery-buffered DC charging with dynamic load balancing across bays, designed to stay within the existing import capacity.

Installation

Coordinated with the DNO, installed DC isolation and earthing to the stricter EV standard, and commissioned load-balancing behaviour on site.

TECHNICAL SPECIFICATIONS

Bays
6 rapid + 4 AC
Peak power
300 kW shared
Buffer
120 kWh
Standards
BS 7671 / IET Code
Grid
G99 notified
Certification
EIC + test pack

SYSTEMS DELIVERED

  • Battery-buffered DC rapid charging
  • Dynamic bay load balancing
  • G99 grid notification
  • EV-specific earthing strategy
  • Per-bay monitoring & billing

Results

  • No grid reinforcement required
  • Bays served within existing capacity
  • Per-bay utilisation reporting
  • Future-proofed for expansion

Gallery

PV ARRAYBATTERYEV RAPID
DC charging bays
PV ARRAYBATTERYEV RAPID
Buffer storage
PV ARRAYBATTERYEV RAPID
Load-balancing panel

More projects

Start a conversation.

We will respond within 2 hours during working hours.

Typical reply: 2 hours. We never share your details.

CallRequest Quote