A high-power EV charging deployment using intelligent load management to serve dense rapid-charging bays from a constrained grid connection.
Birmingham, UKHigh-power EV charging + load management
The challenge
Provide rapid charging for a fleet and visiting bays without triggering an expensive grid reinforcement on a constrained site supply.
Design response
Local battery-buffered DC charging with dynamic load balancing across bays, designed to stay within the existing import capacity.
Installation
Coordinated with the DNO, installed DC isolation and earthing to the stricter EV standard, and commissioned load-balancing behaviour on site.
TECHNICAL SPECIFICATIONS
- Bays
- 6 rapid + 4 AC
- Peak power
- 300 kW shared
- Buffer
- 120 kWh
- Standards
- BS 7671 / IET Code
- Grid
- G99 notified
- Certification
- EIC + test pack
SYSTEMS DELIVERED
- Battery-buffered DC rapid charging
- Dynamic bay load balancing
- G99 grid notification
- EV-specific earthing strategy
- Per-bay monitoring & billing
Results
- No grid reinforcement required
- Bays served within existing capacity
- Per-bay utilisation reporting
- Future-proofed for expansion