Skip to content
Commercial · 2023

Mayfair Commercial Hub

A commercial fit-out for a growing firm, engineered around flexibility — raised-floor power grids and lighting that adapt to team growth.

London, UKCommercial fit-out power, data & lighting

The challenge

Fit out a Cat-A shell into a dense, flexible workspace within a live central-London building, with zero downtime to neighbouring tenants.

Design response

A raised-floor busbar and grid distribution philosophy allowed desks to be reconfigured safely without re-cabling, with lighting zones mapped to team areas.

Installation

Night-shift isolation windows and a clean, documented handover protected neighbouring tenants and the building's lettable programme.

TECHNICAL SPECIFICATIONS

Floor area
1,850 m²
Workpoints
180
Busbar runs
12
Lighting zones
32
UPS runtime
15 min full
Certification
EIC + EICR

SYSTEMS DELIVERED

  • Raised-floor busbar distribution
  • Addressable emergency lighting
  • Open-plan zoning & scene control
  • Meeting-room AV power & data
  • Server room UPS & isolation

Results

  • Full reconfiguration without re-cabling
  • Zero disruption to neighbouring tenants
  • Energy sub-metering from day-one
  • Handover a week ahead of programme

Gallery

OPEN-PLAN · 1,850 m²32 ZONES
Busbar distribution
OPEN-PLAN · 1,850 m²32 ZONES
Office lighting
OPEN-PLAN · 1,850 m²32 ZONES
Server room UPS

More projects

Start a conversation.

We will respond within 2 hours during working hours.

Typical reply: 2 hours. We never share your details.

CallRequest Quote